Gold Supplier Cooling Tunnel Cocoa Bean Grinding Machine Automatic Packing Machine Candy Bar Making Machines
Cooling Tunnel
Air cooling tunnels are universally used for product cooling after molding. Such as filled candy, hard candy, taffy candy, chocolate and many other confectionery products. After conveying to cooling tunnel, products will be cooled by special cooling air. Cooling effect is stable and the whole process is clean. Import compressor from USA and frequency converter greatly improves the stability and durability of this device. Features and Advantages: 1.Cooling tunnel are equipped with 2 sets of 5P refrigeration systems. Direct touch cooling on bottom side and indirect top cooling design. 2.All stainless steel and food grade conveyor belt which in compliance with food hygiene and safety standard. 3.Two stages or even more stages of cooling, such as fresh air cooling and refrigeration cooling,etc. The multi-stage cooling design makes it energy saving, fast cooling, easy operation,etc. 4.Tunnel cover adopts the latest design concept, fully covered and sealed design greatly avoid energy loss. 5.The tunnel cover can be opened or removed easily, no tools needed,easy for cleaning. Technical Parameters:
Model |
LST400C |
LST600C |
LST900C |
Can be customized |
Conveyor Width |
400mm |
600mm |
900mm |
|
Conveyor Speed |
0-8 m/min |
0-8 m/min |
0-8m/min |
|
Total Power |
12kw 380V/400V |
12kw 380V/400V |
15kw 380V/400V |
|
Net Weight |
1800kg |
2100kg |
2400kg |
|
Material |
201 |
201 |
201 |
|
Cooling Unit |
2*5P |
2*5P |
2*5P |
|
Main Motor |
1.5KW |
2.2KW |
3KW |
|
Belt type |
1.5MM thickness White PU belt |
1.5MM thickness White PU belt |
1.5MM thickness White PU belt |
|
Temperature |
5℃-10℃ |
5℃-10℃ |
5℃-10℃ |
|
Temperature decrease |
20℃-40℃ |
20℃-40℃ |
20℃-40℃ |
|
Cooling speed |
50-150kg/h |
100-250kg/h |
200-300kg/h |
|
Dimension |
13000*850*1500 |
15000*900*1500 |
15000*1300*1500 |
Additional Features:
1.2 sets of 5p industrial refrigeration compressor. Complete installation with air cooler, standby at anytime.
2.Frequency conversion speed control.
3.Special cooling channel and cooling air supply method design.Cooling air will not blow away the product during cooling process.
4.Photoelectric detecting and automatic belt deviation correction.
5.Cooling tunnel can be customize according to your requests and needs.
Production time: 40 days